Hotel Auderer
Hospitality for two generations
Two generations of Family Auderer left their marks on the Hotel. It was built and run since the 6th of October 1966 by our parents Waltraud and Gabriel Auderer. Formerly, there was a well-run general shop here, our mother Waltraud ran.
There were 18 rooms for our guests. With time and some construction work the ***Hotel Auderer grew from this little boarding house.
In 1969 the first son Hannes Auderer was born and in 1974 the second one, Paul, followed.
The house was extended by 12 rooms in 1984 and had 56 beds from that point on. A sauna, a whirlpool and a disco were built in the cellar as were a dining area, a reception, and a fireplace.
Due to a tragic accident, our beloved mother Waltraud passed away in March 1993 – she left a big gap.
1996 the big dining area and a seminar room were built, and the kitchen was renovated and extended. Storage rooms and rooms were added, and some rooms were extended. We now had 64 beds.
In addition, the beverage facility was completely rebuilt and brought up to date.
Gründerin Waltraud Auderer († 1993).
Alternation of generation
Handing over to Paul Auderer
Senior boss Gabriel handing over to his son Paul in 1997.
In November 1997 our father Gabriel gave both his businesses to his sons. (Bus company to Hannes and hotel to Paul)
Since this time, Mr Paul Auderer has been running the hotel together with a well-coordinated team and his family.
In 2003, the sauna in the cellar was renewed and a parlour sauna and a steam bath were installed.
In 2005, 2 new rooms were gained from two old bus garages, thus increasing the number of beds to 68.
In 2010, 4 rooms were renovated and modernized.
In 2011, the terrace and the car park were renovated, and a lockable bicycle garage was added. Furthermore, the sauna was enlarged by an outdoor area and an outdoor sauna.
2014 Renewal of the entire heating system with complete heating conversion to natural gas and reduction of Co2 emissions by approx. 40 %.
2016 Extension of the sauna area with a new relaxation room.
2018 Renewal of 5 wet rooms.
2021 Renewal of 6 wet rooms. At the same time, we added a flat, increasing the bed capacity to 72.